Skip to content
email us

Corridor H - Foreman to Moorefield

E.L Robinson Engineering Company was contracted by the West Virginia Department of Transportation, Division of Highways to design a 5 mile stretch of four lane divided highway, known as Corridor H, in Hardy County, West Virginia. This project also included 3.5 miles of access roads, a truck escape ramp, three bridges, and a naturalized stream design.

Our Roadway group utilized their expertise to conduct alignment studies (saving the Division of Highways approximately $20 Million), surveying, right-of-way, maintenance of traffic, drainage, access roads, signing, pavement markings and utility relocations. The Structures group designed dual structures approximately 185 feet long, another 85 foot long structure, as well as a box culvert. Also involved in the project was E.L. Robinson Engineering Company’s team of geotechnical engineers which provided geotechnical investigations and studies, which helped design the 10 million cubic yards of excavation.

  • Location: Tucker County, West Virginia
  • Cost: $75,000,000
  • Client: West Virginia Department of Transportation - Division of Highways
  • Services:
  • Markets:

More Highlighted Projects

Toll Free: 800.856.6485

A 100% Employee Owned Company


West Virginia

  • Charleston
  • Beckley
  • Chapmanville

Ohio

  • Columbus
  • Cleveland
  • Little Hocking

Kentucky

  • Ashland

North Carolina

  • Raleigh

South Carolina

  • Columbia

Virginia

  • Chantilly

*E.L. Robinson Engineering Co. ensures nondiscrimination in all programs and activities in accordance with Title VI of the Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Jayne Gwinn-Charleston Office at 304.776.7473 Ext. 238

© 2024 Copyright - E.L. Robinson Engineering. Website Design + Development: Mind Merge Design
Social Media Policy