Hinton Combined Sewer Overflow Improvements Project Phase I
The project consists of (a) replacing 6,000 LF of old terra cota sewer lines and other related work in the Riverside Drive area of Bellepoint, (b) installing 6,300 LF of storm drain pipe and other related work to separate storm water from the sewer collection system in the Bellepoint area, (c) upgrading the Bellepoint Pump Station, and (d) upgrading the UV disinfection system at the Hinton WWTP.
- Location: Summers County, West Virginia
- Cost: $3,000,000
- Client: City of Hinton
- Services:
- Markets: