FRA-Dodridge Street Bridge
E.L. Robinson Engineering completed plans for the Franklin County Engineer to replace the deficient 206 foot 2 span bridge over the Olentangy River. The project involved an aesthetically enhanced signature bridge. The bridge now has a three-span, post-tensioned, concrete girder end-anchored superstructure.
Other project requirements included correcting the existing deficient roadway alignment, complex hydraulic modeling, developing permanent stormwater run-off controls (BMPs), and providing enhanced 3D renderings for the stakeholder and public involvement meetings.
- Location: Franklin County, Ohio
- Cost: $7,680,000
- Client: Franklin County Engineer
- Services:
- Markets:
- Cut Sheet: