Village of Woodsfield

Woodsfield, OH

The Engineer’s estimate of construction cost for Contract #1 is $1,646,915

Pre-Bid Info

A pre-bid conference will be held at 11:00 AM local time on August 28, 2019 at 221 South Main Street Woodsfield, OH 43793.Attendance at the pre-bid conference is highly encouraged but is not mandatory.

The Issuing Office for the Bidding Documents is:

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313
Attn:Jack Ramsey, P.E.
304-776-7473/jramsey@elrobinson.com

Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 9 A.M and 4 P.M., and may obtain copies of the Bidding Documents from the Issuing Office as described below.

Bidding Documents also may be examined at the following:

Ohio Contractor’s Association
1313 Dublin Road
Columbus, OH 43215

Village of Woodsfield
221 South Main Street
Woodsfield, OH 43793

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313

Printed copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon non-refundable payment of $200.00.Checks for Bidding Documents shall be payable to “E.L. Robinson Engineering Company”.Upon request and receipt of the document deposit indicated above plus a non-refundable shipping charge of $25.00, the Issuing Office will transmit the Bidding Documents via delivery service.The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents.Partial sets of Bidding Documents will not be available from the Issuing Office.Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

Bid Date

Sealed Bids for the construction of the Long Term Control Plan – Phase 3 will be received, by the Village of Woodsfield at its Municipal Building 221 South Main Street Woodsfield, OH 43793 until 1:30 P.M. (Local Time) on September 11, 2019, and then at said office publicly opened and read aloud.

Quantities of Work

Contract #1 – Wastewater Collection System Improvements

The work shall consist of installation of approximately 5,080 LF of HDPE storm pipe ranging in size from 6” to 48”, 51 catch basins, 1,575 LF of 12” and 15” PVC sanitary sewer pipe, 700 LF of DIP sanitary sewer pipe ranging in size from 6” to 18”, 22 sanitary sewer manholes, 510 LF of steel casing bore & jack ranging in size from 20” to 60”, surface restoration, reconnection of existing lines and all other necessary appurtenances.

Key Contact

Jack Ramsey, P.E.
E.L. Robinson Engineering
5088 Washington Street, West
Charleston, WV 25313
304-776-7473
jramsey@elrobinson.com