The Engineer’s estimate of construction cost for this project is $2,911,243.

Pre-Bid Info

A pre-bid conference will be held at 11:00 AM local time on April 25, 2019 at 110 West Main Street; Jewett, OH 43986.Attendance at the pre-bid conference is highly encouraged but is not mandatory.

The Issuing Office for the Bidding Documents is:

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313
Attn:Jack Ramsey, P.E.
304-776-7473/jramsey@elrobinson.com

Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 9 A.M and 4 P.M. and may obtain copies of the Bidding Documents from the Issuing Office as described below.

Bidding Documents also may be examined at the following:

Ohio Contractor’s Association
1313 Dublin Road
Columbus, OH 43215

Village of Jewett
110 West Main Street
Jewett, OH 43986

E.L. Robinson Engineering
5088 Washington Street, West
Charleston, WV 25313

Printed copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon non-refundable payment of $200.00 for each set.Checks for Bidding Documents shall be payable to “E.L. Robinson Engineering Company”.Upon request and receipt of the document deposit indicated above plus a non-refundable shipping charge of $30.00, the Issuing Office will transmit the Bidding Documents via delivery service.The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents.Partial sets of Bidding Documents will not be available from the Issuing Office.Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

Bid Date

Sealed Bids for the construction of the Water System Improvements Project will be received, by the Village of Jewett at its Office: 110 West Main Street, Jewett OH 43986 until 1:30 P.M. (Local Time) on May 9, 2019, and then at said office publicly opened and read aloud.

Quantities of Work

The work shall consist of installation of approximately 9,835 LF of 8” PVC C900, 310 LF of 8” DIP Class 50, 12,825 LF of 6” PVC C900, 1,670 LF of 4” PVC C900, 300 LF of 3” DIP Class 50, 3,675 LF of 2” PVC, 1,760 LF of 1” PE, 26 EA 8” Gate Valves, 51 EA 6” Gate Valves, 6 EA 4” Gate Valves, 1 EA 3” Gate Valve, 4 EA 2” Gate Valves, 297 EA 3/4” Meter Setting, Replacing 27 EA Fire Hydrant Assemblies, 6 EA New Fire Hydrant Assemblies, 10 EA Blow-Off Hydrant Assemblies, Reconnection of 297 EA Service Lines, 7,550 LF of ¾” PE Service Line and all other necessary appurtenances.

Key Contact

Attn:Jack Ramsey, P.E.
E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313
304-776-7473/jramsey@elrobinson.com

Border Patrol LLC
740.937.2002

James White Construction
304.748.8181

Shelly & Sands, Inc.
740.859.2104

National Road Utility Supply, Inc.
304.547.0101

X-Press Underground, Inc.
330.542.1175

J.S Bova Excavating
234.353.2224

Stone Gate
304.482.2721