Kanawha Falls PSD

Fayette County, WV

Pre-Bid Info

A pre-bid conference will be held at 1:00 PM local time on May 11, 2020 at 362 Main Street Gauley Bridge, WV 25085.Attendance at the pre-bid conference is mandatory.

The Issuing Office for the Bidding Documents is:

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313
Attn:Jack Ramsey, P.E.
304-776-7473/jramsey@elrobinson.com

Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 9 A.M and 4 P.M., and may obtain copies of the Bidding Documents from the Issuing Office as described below.

Bidding Documents also may be examined at the following:

WV Contractor’s Association
2114 Kanawha Boulevard East
Charleston, WV 25311

Kanawha Falls PSD
362 Main Street
Gauley Bridge, WV 25085

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313

Printed copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon non-refundable payment of $275.00 for Contract #1 or Contract #2.Checks for Bidding Documents shall be payable to “E.L. Robinson Engineering Company”.Upon request and receipt of the document deposit indicated above plus a non-refundable shipping charge of $30.00 (for each set), the Issuing Office will transmit the Bidding Documents via delivery service.The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents.Partial sets of Bidding Documents will not be available from the Issuing Office.Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

Bid Date

Sealed Bids for the construction of the Wastewater Treatment and Collection System Improvements will be received, by the Kanawha Falls PSD at its offices on 362 Main Street Gauley Bridge, WV 25085 until 1:30 P.M. (Local Time) on May 27, 2020, and then at said office publicly opened and read aloud.

Quantities of Work

Contract #1 – Wastewater Treatment Plant Improvements

The work shall consist of renovating the plant lift station, improvements to the headworks, including replacing the automatic bar screen and grit washer / compactor, renovating the three (3) existing treatment units, replacing the aeration blowers, replacing the chlorine and sulfur dioxide buildings / equipment, improvements to the washwater pump station, installing a new conveyor on the belt filter press, replacing the emergency generator, replacing the effluent line headwall, other miscellaneous improvements and all other necessary appurtenances.The Work will be substantially completed within 270 days after the date when the Contract Times commence to run and ready for final payment within 300 days after the date when the Contract Times commence to run.

Contract #2 – Wastewater Collection System Improvements

The work shall consist of rehabilitating existing lift stations #1, #2, #3, #4, #5, #6, #7, #9, #10 and #12, abandoning lift station #11, installation of three (3) metering manholes, installing approximately 225 LF of 8-inch DIP, 315 LF of 8” PVC pipe, 425 LF of 16-inch steel casing bore & jack, seven (7) sanitary sewer manholes, surface restoration and all other necessary appurtenances.The Work will be substantially completed within 240 days after the date when the Contract Times commence to run and ready for final payment within 270 days after the date when the Contract Times commence to run.

Key Contact

Jack Ramsey, P.E.
E.L. Robinson Engineering
5088 Washington Street, West
Charleston, WV 25313
304-776-7473
jramsey@elrobinson.com

Triton Construction, Inc.
304.759.2100

FAMCO
304.529.3328

1Korin3-10, Inc.
304.542.0977

Orders Construction
304.722.4237

C2G Engineering
304.690.1111

CI Thornburg
304.633.3471

Hayslett Construction
304.757.9348

Breckenridge Corporation
304.472.3350

Tribute Contracting
740.451.1010