Webster Springs PSD

Webster County, WV

Pre-Bid Info

A pre-bid conference will be held at 10:00 AM local time on November 5, 2019 at 38 Clean Water Lane Webster Springs, WV 26288.Attendance at the pre-bid conference is mandatory.

The Issuing Office for the Bidding Documents is:

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313
Attn:Jack Ramsey, P.E.
304-776-7473/jramsey@elrobinson.com

Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 9 A.M and 4 P.M. and may obtain copies of the Bidding Documents from the Issuing Office as described below.

Bidding Documents also may be examined at the following:

WV Contractor’s Association
2114 Kanawha Boulevard East
Charleston, WV 25311

Webster Springs PSD
38 Clean Water Lane
Webster Springs, WV 26288

E.L. Robinson Engineering Company
5088 Washington Street, West
Charleston, WV 25313

Printed copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon non-refundable payment of $175.00 for Contract #1 or Contract #2.Checks for Bidding Documents shall be payable to “E.L. Robinson Engineering Company”.Upon request and receipt of the document deposit indicated above plus a non-refundable shipping charge of $25.00, the Issuing Office will transmit the Bidding Documents via delivery service.The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder’s date of receipt of the Bidding Documents.Partial sets of Bidding Documents will not be available from the Issuing Office.Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

Bid Date

Sealed Bids for the construction of the Bergoo Wastewater Treatment Plant will be received, by the Webster Springs PSD at its offices on 38 Clean Water Lane Webster Springs, WV 26288 until 1:30 P.M. (Local Time) on December 4, 2019, and then at said office publicly opened and read aloud.


Quantities of Work

Contract #1 – Wastewater Collection System

The work shall consist of installation of approximately 2,465 LF of 8-inch GSP, 2,425 LF of 6-inch GSP, 4,010 LF of 2-inch HPDE force main, 25 LF of 1-1/2-inch HDPE force main, 31 EA manholes, 4 EA gravity cleanouts, 3 EA force main cleanouts, 40 LF of 12-inch steel casing bore and jack, 185 LF of 4-inch steel casing bore and jack, 50 LF of 4-inch steel casing open cut, 4 EA duplex lift stations, 1 EA triplex lift station, surface restoration, reconnection of existing lines and all other necessary appurtenances.

Contract #2 – Wastewater Treatment Plant

The work shall consist of construction of a 10,000 gpd packaged treatment unit, UV disinfection system, flow meter, control building, emergency generator and all other necessary appurtenances.

Key Contact

Jack Ramsey, P.E.
E.L. Robinson Engieering
5088 Washington Street, West
Charleston, WV 25313
304-776-7473 Ext. 250

J.F. Allen Company
304.460.7424

Pro Contracting
304.745.8501

Bear Contracting
304.326.0160

FAMCO
304.529.3328